Customer's Name | Project Name | Specification | Date of Contract |
State Grid Anhui Electric Power Company | Ximeng-Taizhou EHV D.C.Line Engineering | ACSR 1250/70 | 2016 |
State Grid Corporation of China | 800kv Jiuquan – Hunan transmission line | ACSR 1250/70 ACSR 1250/100 |
2015 |
State Grid Anhui Electric Power Company | Banji power plant-Yingzhou 500kv transmission Line Project | AAAC 425 | 2015 |
State Grid Xinjiang Electric Power Materials Company | State Grid Aletai Power Supply Company 220kv Power Transmission and Transformation | AAAC 335 | 2015 |
State Grid Anhui Electric Power Company | Wenfeng-Gubei 220KV Line Project | AAAC 425 | 2015 |
State Grid Beijing Electric Power Company | Ximeng-Shandong 1000kv EHV A.C.Line Engineering | ACS 170 ACSR 630/45 |
2015 |
Shanxi Province Electric Power Company | Mengxi-South Tianjin 1000kv EHV A.C.Line Engineering | ACSR 630/45 | 2015 |
Luoyang Engineering Headquarters of Zhengzhou Railway Bureau | Ningxi Railway Xi'an to Hefei Additional Second Line Engineering (Zhengzhou Bureau Pipe Section) | Cu-Mg Alloy Strand JTM-120, JTMH-95 |
2014 |
Hohhot Railway Bureau | Newly-built Dongsheng-Wuhai to Baotou-Xi'an Railway Link Line Post- station Engineering and Gede'ergai- Ordos Front-station Engineering |
High strength Cu-Ag Alloy Contact Wire CTAH150, CTAH120,CTAH85 |
2014 |
Henan Electric Power Company of State Grid Cooperation | Zhumadian Biyang 220kV Tongshan substation the second power engineering | AAAC -425 | 2014 |
Zhejiang Provincial Electric Power Equipment & Materials Supply Company (subsidiary of State Grid Cooperation) | Dongying-Huanghe 500kV substation 220kv overhead line Send project | ACAR 465/210 | 2014 |
Zhejiang Provincial Electric Power Equipment & Materials Supply Company (subsidiary of State Grid Cooperation) | Xiaopu substation 220kv Send project | Acsr 630/45 Acsr 500/45 |
2014 |
Zhejiang Provincial Electric Power Equipment & Materials Supply Company (subsidiary of State Grid Cooperation) | Lingang 220kv power transmission project | ACSR 630/45 | 2014 |
State Grid Materials Co., Ltd | Xiluodu-West of Zhejiang ±800kV DC Transmission Line Project |
ACSR-900/75 ACSR- 900/40 |
2013 |
Xinjiang Electric Power Co., Ltd. | (Infrastructure) Kuchea -Bayinguoleng 750kV Transmission Line Project |
ACS-120 | 2013 |
(Xinjiang) Bazhou Power Supply Co., Ltd. | (Infrastructure) Bazhou Yanqikanlai 110 kV Power Transmission Project |
AAAC-275 | 2013 |
Hubei Electric Power Company | Shennongjia 35kV Baishanyuan Power Transmission Project |
AACSR-240/40 | 2013 |
Tianjin South Central Railway Co., Ltd. | Tianjin Railway Junction Southwest Loop Reconstruction Project | Cu-Mg Alloy Strand JTMH-70, JTM-95 | 2013 |
Henan Electric Power Company(subsidiary of State Grid Cooperation) | 500kV South of Nanyang Power Transmission Project |
TACSR-1440/120 | 2013 |
China Southern Power Grid Co., Ltd. EHV Transmission Company |
Xiluodu Right Bank Power Station in Guangdong ± 500kV Power Transmission Tower with Double DC Works |
ACSR-900/75 | 2012 |
Fujian Electric Power Co., Ltd. | 500kVLili-DongtaiⅡ Circuit Transmission Line Project |
ACSR/AW-800/55 | 2012 |
Heilongjiang Electric Power Company Limited | New Construction Whitehead variable - Apricot Change Line |
GSW-80 | 2012 |
Western of Liaoning Project, Headquarters of Shenyang Railway Bureau |
Dahushan-Zhengjiatun Railway (The Second Railway Line Built Out From Dahushan to Xinlitun segment) |
Soft copper strand, AAC-50, AAC-70 CTAH-120, CTAH-85, JTMH-95, JTMH-70 |
2012 |
Tianjin Tianshun Cable Co., Ltd. | 35kV Temporary Substation Power Line Project |
AACSR/AW-185/25 | 2012 |
State Grid Materials Co., Ltd | Hami-Zhengzhou±800kV UHV DC Transmission Line Project(Bid 1, Bid-2) |
ACS-150 | 2012 |
Sichuan Electric Power Corporation | Kangding - Chongzhou III, IV back to the 500kV Transmission Line Project |
ACSR-630/45 | 2011 |
Hubei Electric Power Company | 200kV Fancheng-Hedian Transmission Line Project |
ACSR/AW-400/35, 630/40 |
2011 |
Electrical Engineering Co., Ltd of CTCE Group |
Procurement of Jinzhou-Chifeng New Railway Project |
GSW-50 GSW-25 |
2011 |
Logistics Service Center of Guizhou Power Grid Corporation | Tongren Power Supply Burea, Shatuo Hydroelectric Station 220kV Send Line Project |
ACS-150 | 2011 |
State Grid Shanxi Electric Power Company | 750kV Shanxi Huadianyuheng Power Plant-Yuheng Transmission Line Project |
AAAC-1300 | 2010 |
Henan electric power company | 220kV Hongshan transmission line project |
GSW-80 | Apr 2010 |
Shandong electric power company | 660kV Ningdong-Shandong D.C. transmission line project |
ACSR-1000/45 | Mar 12,2010 |
Jilin electric power company limited power grid construction branch | 500kV Baicheng-Baicheng power plant Baicheng- Songyuan transmission line project |
ACSR-400/35 | Jan 14,2009 |
North China Grid company limited matrial branch | 500kV Datong power plant-Fangshan III circuit transmission line project |
ACSR-300/40 | Mar 17,2009 |
Hennan Electric Power Survey & Design Institute | 500kV Yuzhou power plant transmission line project |
ACSR-630/45 | Apr 30,2009 |
Inner Mongolia Bayanzhuoer Electric Power Bureau | Wuba transmission line project | GSW-35 GSW-70 |
Sep 2009 |
Lanzhou Railway Administration | Lanxin Jiayuguan-Hongliu electrification rebuilt project | ACSR/ AS-240/30 |
Sep 28,2009 |
Lanzhou Railway Administration | Lanxin Jiayuguan-Hongliu electrification rebuilt project | ACSR/ AS-120/20 |
Sep 28,2009 |
Wuhan Railway Administration | Luohe-Fuyang second line project | ACSR/ AS-185/25 |
Nov 16,2009 |
Jincheng Juneng State Grid Project Company Limited | 110kV Tianzefusheng transmission line project |
GSW-50 | Dec 2009 |
Liaoning electric power company | Qinghe electrical company | GSW-80 | Dec 2009 |
Shaanxi electric power material company | 330kV Weinan switch station-Dongnanxiao double circuit transmission line project |
ACSR-400/35 | Jan 23,2008 |
Shanxi electric power company | 500kV Shuozhou-Gujiao transmission line project |
ACSR-300/40 | Feb 29,2008 |
Henan electric power company | 500kV Shaoling-Xiangfu-Xuchang I II circuit transmission line project |
ACSR-400/35 | Apr 28,2008 |
Tianshui extra-high voltage transmission and distribution company | 330kV Wudu-Tianshui transmission line project |
ACSR-300/50 | May 30,2008 |
Hennan Electric Power Survey & Design Institute | 500kV Qinbei power plant transmission line project |
ACSR-630/45 | Jul 4,2008 |
Hennan Electric Power Survey & Design Institute | 500kV Xinyang power plant transmission line project |
ACSR-630/45 | Aug 1,2008 |
Northeast China Grid company limited Shenyang extra-high voltage bureau | 500kV Shaling-Shendong-Xujia II circuit transmission line project |
ACSR-400/35 | Sep 11,2008 |
Chifeng Electric Power Bureau | Dare transmission line project | GSW-50 GSW-35 |
Sep 2008 |
Shaanxi electric power company material Company | 750kV Binchang power plant-Qianxian II circuit transmission line project |
ACSR-500/45 | Oct 10,2008 |
Henan Tong-Da Cable Co., Ltd.
Office Add.: Room 2110, Missun Center, No.33 East Jinshui Road, Zhengzhou City, Henan Province
Factory Add.: Shijiawan Industrial Zone, Yanshi, Luoyang City, Henan Province
Tel.: +86-371-60311151
Fax: +86-371-60311150